SECTION 7" Wall Attachment Channel Installation 7-1. Measuring and Cutting Wall Attachment Channel
7-2. Slitting or Notching the Wall Channel Note: For the Weather Guard roof, cut a 1-1/2 inch slit on the top as well (Figure 7.2 Detail "A"). Repeat this for the other wall channel. Note: For the beam roof, cut a notch so that the outside face of the wall channel covers the outside edge of the roof attachment channel. See Figure 7.1, Detail "B", and Figure 7.2, Detail "B" for a profile view of the notch. Repeat this for the other wall channel. Note: In applications under an existing roof or in between two posts (where the module spacing will be very tight) it may be necessary to cut off the outside fin of the wall channel in order to fit the module(s) into place. The fin will be reattached once the module is in place. |
![]() |
7-3. Checking for Square 7-4 Pre-Drilling, Sealing, and Securing the Wall Channel Note: Expanding inserts may be used to secure the bolts to a stucco wall. |
![]() |
Copyright 2007 Room Kits | Sunrooms | Patio Rooms | Garden Rooms by kkits.com